Australian Premium Logistics

Steel Delivery
to Perth Sites.

Steel delivery across Perth. Beams, plate, sheet, structural steel, picked up from your supplier and lifted off the truck where the build needs it. Owner-operated Hino, HIAB on deck, fixed quote.

  • 6,200 kg Lift
  • 8.0 m Reach
  • Fully Insured
  • Owner-Operated

Tell Us The Job

Ben or Ryan get back to you within 1 business day. Or call +61 416 692 022 and skip the form.

Thanks. Ben or Ryan will get back to you within 1 business day.

Structural Steel, Beams, Plate, Sheet, Straight to the Build.

  • Structural steel beams and columns
  • Steel plate and bar
  • Roof and wall steel sheets
  • Reinforcing mesh and rebar bundles
  • Pre-fabricated steel components
  • Steel from supplier to build site
  • On-site steel relocations
  • Trade collection and delivery runs

Bundle weights, crane reach and tray dimensions are all on the crane truck load capacity page. Send your supplier address and site address on the call and we will price the run.

Supplier to site is a straight general haulage run across Perth with a lift on the end. Build crews who want the same truck back for other lifts on the same site book it as HIAB hire in Perth.

A Trade-Friendly Delivery, Not a Steel Reseller.

Build crews waste time hand-balling steel from the kerb. The HIAB on our Hino lifts beams and bundles straight off and places them where you actually need them. Ben and Ryan run the truck, so the person on the phone is the person on the lift.

  • Owner-Operated
  • Modern Hino Fleet
  • Fully Insured
  • Free Quotes, No Obligation
  • Residential & Commercial
  • Perth-Wide
Hino truck with HIAB crane carrying steel for a Perth build

Supplier to Site, Three Steps.

01

Send the Run

Call, email or send the form. Supplier address, site address, what is being lifted, and any site access notes.

02

Fixed Quote Back

We price it on the call or within one business day. Fixed number, no creep, no obligation.

03

Loaded, Lifted, Placed

Steel loaded at the supplier, hauled to site, lifted off and placed exactly where the build needs it.

Steel Delivery, Answered.

Do You Sell Steel or Just Deliver It?

We deliver, we do not sell. Your supplier loads it on us, we get it to your site. If you are looking to buy steel, talk to a Perth steel merchant first and then book us for the delivery run.

Can You Lift the Steel off the Truck on Site?

Yes, that is the point of the HIAB. Beams, plate, bundles, all lifted off and placed where the builder wants them. Saves the trade crew hand-balling material from the kerb.

Can You Coordinate with the Supplier and the Build?

Yes. Give us both ends of the run on the call and we will line it up. Most steel runs are next-day or same-day depending on supplier availability.

Got Steel to Shift?
Let's Run It.

Free quote, no obligation. Most jobs booked the same day we talk.

Call Ben Directly